WhatsApp at (+91-9098855509) Support
ijprems Logo
  • Home
  • About Us
    • Editor Vision
    • Editorial Board
    • Privacy Policy
    • Terms & Conditions
    • Publication Ethics
    • Peer Review Process
  • For Authors
    • Publication Process(up)
    • Submit Paper Online
    • Pay Publication Fee
    • Track Paper
    • Copyright Form
    • Paper Format
    • Topics
  • Fees
  • Indexing
  • Conference
  • Contact
  • Archieves
    • Current Issue
    • Past Issue
  • More
    • FAQs
    • Join As Reviewer
  • Submit Paper

Recent Papers

Dedicated to advancing knowledge through rigorous research and scholarly publication

  1. Home
  2. Recent Papers

REVIEW PAPER ON USE OF RCA IN BITUMINOUS CONCRETE

Pankaj Verma Verma

Download Paper

Paper Contents

Abstract

The inspiration driving this study is to cultivate a model for traffic volume deciding of the road network in metropolitan Region. The portrayal of the continuous traffic volumes is engaged using PTV programming, which is used as a data gained through manual other than customized counting of vehicles and talking traffic individuals. To cultivate the deciding model, there has been the need to spread out an enlightening record contingent upon time series which engages interface between portion, monetary factors and traffic volumes. Close to the beginning models have been made by MLR and ANN strategies using one of a kind data on factors. To take out high connection between's variables appeared by individual models, PCA system, which changes elements to head parts (PCs), has been used. These PCs are used as commitment to demand to encourage joined models PCA-MLR and PCA-RBF in which the minimization of goofs in busy time gridlock volumes gauging is generally attested.Transient traffic stream assessing is a fundamental limit in state of the art busy time gridlock the load up systems (ATMS) other than undeniable level pioneer information structures (ATIS). Precise measuring results are important to show future traffic conditions other than assist with dealing with bosses searching for deals with serious consequences regarding blockage issues on metropolitan expressways other than surface streets. There is new assessment interest in transitory busy time gridlock stream deciding as a result of continuous upgrades in ITS advances. Past assessment remembers progressions for various districts, other than a basic number of assessing procedures exist recorded as a hard copy.

Copyright

Copyright © 2024 Pankaj Verma . This is an open access article distributed under the Creative Commons Attribution License.

Paper Details
Paper ID: IJPREMS40700025046
ISSN: 2321-9653
Publisher: ijprems
Page Navigation
  • Abstract
  • Copyright
About IJPREMS

The International Journal of Progressive Research in Engineering, Management and Science is a peer-reviewed, open access journal that publishes original research articles in engineering, management, and applied sciences.

Quick Links
  • Home
  • About Our Journal
  • Editorial Board
  • Publication Ethics
Contact Us
  • IJPREMS - International Journal of Progressive Research in Engineering Management and Science, motinagar, ujjain, Madhya Pradesh., india
  • Chat with us on WhatsApp: +91 909-885-5509
  • Email us: editor@ijprems.com
  • Mon-Fri: 9:00 AM - 5:00 PM

© 2025 International Journal of Progressive Research in Engineering, Management and Science.Designed and Developed by EVG Software Solutions All Rights Reserved.

Terms & Conditions | Privacy Policy | Publication Ethics | Peer Review Process | Contact Us